|Berm height (mm)||This is the height of the curb which constrains the overland sheet flow of water. Where curb cuts or other outlet exists at the lowest point of the pavement, the suggested value is 0. | |Berm height (mm)||This is the height of the curb which constrains the overland sheet flow of water. Where curb cuts or other outlet exists at the lowest point of the pavement, the suggested value is 0. | ||
Line 10: | Line 10: | ||
|Surface slope (%)||Typically between 1 – 4% (most commonly 2%) [[Winter]] | |Surface slope (%)||Typically between 1 – 4% (most commonly 2%) [[Winter]] | ||
|- | |- | ||
!colspan = "2" style="background: darkcyan; color: white; align = center"|Pavement | |||
|- | |- | ||
|Thickness (mm)||This is the thickness of just the pre-cast blocks (or depth of asphalt/concrete poured in place). | |Thickness (mm)||This is the thickness of just the pre-cast blocks (or depth of asphalt/concrete poured in place). | ||
Line 23: | Line 23: | ||
|Clogging factor||? | |Clogging factor||? | ||
|- | |- | ||
!colspan = "2" style="background: darkcyan; color: white; align = center"|Soil (Bedding layer?) | |||
|- | |- | ||
|Thickness (mm)||Depth of bedding layer | |Thickness (mm)||Depth of bedding layer | ||
Line 39: | Line 39: | ||
|Suction head (mm)||Suggested value 50 for sand <ref name = SWMM/> | |Suction head (mm)||Suggested value 50 for sand <ref name = SWMM/> | ||
|- | |- | ||
!colspan = "2" style="background: darkcyan; color: white; align = center"|Storage | |||
|- | |- | ||
|Thickness (mm)||Depth of all aggregate bases | |Thickness (mm)||Depth of all aggregate bases | ||
Line 51: | Line 51: | ||
|Design drawdown time (hrs)||Recommend 48 hours? | |Design drawdown time (hrs)||Recommend 48 hours? | ||
|- | |- | ||
!colspan = "2" style="background: darkcyan; color: white; align = center"|Drain (underdrain) | |||
|- | |- | ||
|Flow coefficient||Suggested value 1 | |Flow coefficient||Suggested value 1 |
Revision as of 00:51, 6 September 2017
Surface | |
---|---|
Berm height (mm) | This is the height of the curb which constrains the overland sheet flow of water. Where curb cuts or other outlet exists at the lowest point of the pavement, the suggested value is 0. |
Surface roughness (Manning’s n) | Lower numbers indicate less surface obstruction and result in faster flow.
Suggested range for pavement 0.01 – 0.02 [1] |
Surface slope (%) | Typically between 1 – 4% (most commonly 2%) Winter |
Pavement | |
Thickness (mm) | This is the thickness of just the pre-cast blocks (or depth of asphalt/concrete poured in place). |
Void ratio | This most commonly refers to the jointing material used between precast blocks. Suggest range 0.35 – 0.4 unless otherwise tested. Where a pervious product is poured in place, an appropriate figure should be obtained from the manufacturer. |
Impervious surface fraction | This is the proportion of the total pavement taken up with the pre-cast blocks and will vary between products; an example value may be 0.85.
Where a pervious product is poured in place, this value will be 0. |
Permeability (mm/hr) | This is the permeability of the joint material in block systems. Where the permeability of the bulk surface is measured and known instead, the impervious fraction can be adjusted to model a block surface as continuously permeable instead. |
Clogging factor | ? |
Soil (Bedding layer?) | |
Thickness (mm) | Depth of bedding layer |
Porosity (fraction) | Suggested range 0.35 – 0.4 unless otherwise tested |
Field capacity (fraction) | Suggested range 0.10 - 0.12 for sand[1] |
Wilting point (fraction) | Suggested value 0.03 for sand[1] |
Conductivity (mm/hr) | Suggested range 100 – 250 mm/hr for sand |
Conductivity slope | Suggested value 45 for sand [1] |
Suction head (mm) | Suggested value 50 for sand [1] |
Storage | |
Thickness (mm) | Depth of all aggregate bases |
Void ratio | Suggest range 0.35 – 0.4 unless otherwise tested |
Seepage rate (mm/hr) | Infiltration rate of native soil |
Clogging factor | ? |
Design drawdown time (hrs) | Recommend 48 hours? |
Drain (underdrain) | |
Flow coefficient | Suggested value 1 |
Flow exponent | Suggested value 1 |
Offset height | This is the height from the base of the cell to the height at which the drain discharges. In some designs this may be the height of the perforated pipe within the storage layer. In other designs this height is adjusted by creating an upturn in the discharge pipe. Permeable paving |
- ↑ 1.0 1.1 1.2 1.3 1.4 Oregon State Univ., Corvallis. Dept. of Civil, Construction and Environmental Engineering.; Environmental Protection Agency, Cincinnati ONRMRL. Storm Water Management Model Reference Manual Volume I Hydrology (Revised). 2016:233. https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P100NYRA.txt Accessed August 23, 2017.