Changes

Jump to navigation Jump to search
no edit summary
Line 8: Line 8:
*[[Grasses| Resilient turf grass]]
*[[Grasses| Resilient turf grass]]
*[[Check dams]], to facilitate short term ponding
*[[Check dams]], to facilitate short term ponding
'''Additional components may include:'''
'''Additional components may include:'''
*[[Absorbent landscapes| Amended soil]], to increase infiltration to soils below
*[[Absorbent landscapes| Amended soil]], to increase infiltration to soils below
*[[Liner|Impermeable membrane]], to prevent infiltration to soils below
*[[Liner|Impermeable membrane]], to prevent infiltration to soils below
*[[Turf reinforcement]], to prevent scour
*[[Turf reinforcement]], to prevent scour
==Design==
*Minimum residence time of 5 minutes.
*Maximum flow velocity 0.3 m/s
*Bottom width between 0.6 - 2.4 m
*Minimum length 30 m
{|class="wikitable"
|+ Slope variations
|-
|< 2 %||Use underdrain to distribute water for infiltration
|-
|2 - 5 %||Design swale for surface flow, consider check dams
|-
||5 %||Check dams required to reduce effective slope to 2 – 3 %
|}
Maximum depth of flow
1/3 height of vegetation for infrequently mown swales.
½ height of grass for regularly mown swales, to maximum of 75 mm.

Navigation menu