Difference between revisions of "Absorbent landscapes"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 19: Line 19:


==See also==
==See also==
[[Downspout disconnection]]
*[[Downspout disconnection]]
[[vegetated filter strips]]
*[[vegetated filter strips]]


[[category: infiltration]]
[[category: infiltration]]

Revision as of 17:50, 12 September 2017

Get excited! This page is going to contain content prepared by Dean Young!

Soil amendment guidelines (from 2010 guide section 3 - placed here by Jen)

Soil amendment sizing criteria: impervious area / soil area = 1

  • use 100 mm compost, till to 300 - 450 mm depth

impervious area / soil area = 2

  • use 200 mm compost, till to 300 - 450 mm depth

impervious area / soil area = 3

  • use 300 mm compost, till to 450 - 600 mm depth

Compost should consist of well-aged (at least one year) leaf compost. Amended soil should have an organic content of 8-15% by weight or 30-40% by volume. Source: Soils for Salmon, 2005


In the meantime, here's a few materials links that may prove useful

See also[edit]