Difference between revisions of "Permeable pavements: Specifications"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) m |
Jenny Hill (talk | contribs) m |
||
Line 11: | Line 11: | ||
* Void ratio = 14% - 31% | * Void ratio = 14% - 31% | ||
* Permeability = 900 - 21,500 mm/hr | * Permeability = 900 - 21,500 mm/hr | ||
|Thickness will range from 100 mm-150 mm depending on the expected loads | |Thickness will range from 100 mm - 150 mm depending on the expected loads | ||
|- | |- | ||
|'''Porous Asphalt''' | |'''Porous Asphalt''' | ||
| | | | ||
* open-graded asphalt mix with a minimum of 16% air voids | * open-graded asphalt mix with a minimum of 16 % air voids | ||
* Polymer can be added to provide additional strength to heavy loads | * Polymer can be added to provide additional strength to heavy loads | ||
|Thickness will range from 50 mm-100 mm depending on the expected loads | |Thickness will range from 50 mm - 100 mm depending on the expected loads | ||
|- | |- | ||
|'''Permeable Pavers''' | |'''Permeable Pavers''' |
Revision as of 20:33, 16 October 2017
Material | Specification | Quantity |
---|---|---|
Pervious Concrete |
|
Thickness will range from 100 mm - 150 mm depending on the expected loads |
Porous Asphalt |
|
Thickness will range from 50 mm - 100 mm depending on the expected loads |
Permeable Pavers |
|
|