Changes

Jump to navigation Jump to search
m
Line 14: Line 14:
#[[Sub-surface components]]
#[[Sub-surface components]]
#[[Finishing grades: inlet, outlet, and surface layer]]
#[[Finishing grades: inlet, outlet, and surface layer]]
#Post-construction
#[[Post-construction]]]


Stages 1-3 and 5 of the LID construction process are fundamentally similar for all '''surface-level LID''' types (bioretention, bioswales, enhanced grass swales, permeable pavements, infiltration chambers, infiltration trenches, soakaways, etc.). To illustrate, STEP's recommended processes for excavation do not differ depending on the practice type. Excavation is excavation, whether it is for a bioretention garden or a permeable pavement parking lot. On the other hand, stage 4 sub-tasks will vary substantially from LID type to LID type, as do some sub-tasks in stage 3. The following gives a brief explanation of each over-arching stage and links to the pages dedicated to each construction stage.
Stages 1-3 and 5 of the LID construction process are fundamentally similar for all '''surface-level LID''' types (bioretention, bioswales, enhanced grass swales, permeable pavements, infiltration chambers, infiltration trenches, soakaways, etc.). To illustrate, STEP's recommended processes for excavation do not differ depending on the practice type. Excavation is excavation, whether it is for a bioretention garden or a permeable pavement parking lot. On the other hand, stage 4 sub-tasks will vary substantially from LID type to LID type, as do some sub-tasks in stage 3. The following gives a brief explanation of each over-arching stage and links to the pages dedicated to each construction stage.
722

edits

Navigation menu