====Monitoring Wells====
[[Monitoring wells]] allow for measurement of water levels in the sub-surface components of LID practices. They are important for sampling procedures and ensuring that the LID feature are performing as intended.<br>
[[Monitoring wells]] allow for measurement of water levels in the sub-surface components of LID practices. They are important for sampling procedures and ensuring that the LID feature are performing as intended.<br>


Construction Steps:<br>
'''Construction Steps:'''<br>
#Install a cap stand at the required elevation to anchor the monitoring well.
#Install a cap stand at the required elevation to anchor the monitoring well.
#Wrap the perforated pipe with a geotextile sock (to prevent migration of soil into the well).
#Wrap the perforated pipe with a geotextile sock (to prevent migration of soil into the well).
Line 9: Line 10:
#Install monitoring equipment (e.g., a level logger) if required.<br>
#Install monitoring equipment (e.g., a level logger) if required.<br>


Key Inspection Points:<br>
'''Key Inspection Points:'''<br>
*Pipe is perforated, rigid, and matches design specifications
*Pipe is perforated, rigid, and matches design specifications.
*Well is installed according to contract documents
*Well is installed according to contract documents.
*Geotextile sock is wrapped around the perforated portion of the well<br>
*Geotextile sock is wrapped around the perforated portion of the well.<br>


Mistakes to Avoid:<br>
'''Mistakes to Avoid:'''<br>
*Incorrect sequencing – ensure that standpipe is installed prior to backfilling with granular material<br>
*Incorrect sequencing – ensure that standpipe is installed prior to backfilling with granular material.<br>

Revision as of 01:37, 21 July 2022

Monitoring well installed to subgrade.

Monitoring Wells[edit]

Monitoring wells allow for measurement of water levels in the sub-surface components of LID practices. They are important for sampling procedures and ensuring that the LID feature are performing as intended.

Construction Steps:

  1. Install a cap stand at the required elevation to anchor the monitoring well.
  2. Wrap the perforated pipe with a geotextile sock (to prevent migration of soil into the well).
  3. Anchor the perforated pipe to the bottom of the LID feature.
  4. Install a lockable cap to the top of the standpipe to protect against vandalism.
  5. Install monitoring equipment (e.g., a level logger) if required.

Key Inspection Points:

  • Pipe is perforated, rigid, and matches design specifications.
  • Well is installed according to contract documents.
  • Geotextile sock is wrapped around the perforated portion of the well.

Mistakes to Avoid:

  • Incorrect sequencing – ensure that standpipe is installed prior to backfilling with granular material.