Difference between revisions of "Overflow: Installation"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 2: Line 2:


Construction Steps:<br>
Construction Steps:<br>
#Connect the overflow drain to the underdrain
#Connect the overflow drain to the underdrain.
#Install overflow pit to grade at the location specified in the contract documents
#Install overflow pit to grade at the location specified in the contract documents.
#Fit a metal, domed grate to the overflow<br>
#Fit a metal, domed grate to the overflow.<br>


Key Inspection Points:<br>
Key Inspection Points:<br>
*Overflow drain matches design specifications
*Overflow drain matches design specifications.
*Overflow pit is positioned at the maximum water surface elevation of the practice, as per the contract documents
*Overflow pit is positioned at the maximum water surface elevation of the practice, as per the contract documents.
*Sufficient freeboard is provided between the overflow and inlet such that the inlet is not inundated by design storm flows
*Sufficient freeboard is provided between the overflow and inlet such that the inlet is not inundated by design storm flows.
*Overflow grate matches design specifications
*Overflow grate matches design specifications.
*Overflow grates located in high-traffic areas are screwed on or equipped with locks<br>
*Overflow grates located in high-traffic areas are screwed on or equipped with locks.<br>


Mistakes to Avoid:<br>
Mistakes to Avoid:<br>
*Backflows – ensure that backflows are avoided by confirming that inlet and overflow elevations match design specifications with surveys
*Backflows – ensure that backflows are avoided by confirming that inlet and overflow elevations match design specifications with surveys.
*Incorrect sequencing – install overflow drain prior to backfilling with granular material and engineered soil
*Incorrect sequencing – install overflow drain prior to backfilling with granular material and engineered soil.
*Incorrect grate material – avoid using plastic overflow grates due to breakages and UV degradation<br>
*Incorrect grate material – avoid using plastic overflow grates due to breakages and UV degradation.<br>


<gallery mode="packed" widths=300px heights=300px>
<gallery mode="packed" widths=300px heights=300px>

Revision as of 01:44, 21 July 2022

Overflows are features of inline facilities and convey larger storm events out of the LID feature.

Construction Steps:

  1. Connect the overflow drain to the underdrain.
  2. Install overflow pit to grade at the location specified in the contract documents.
  3. Fit a metal, domed grate to the overflow.

Key Inspection Points:

  • Overflow drain matches design specifications.
  • Overflow pit is positioned at the maximum water surface elevation of the practice, as per the contract documents.
  • Sufficient freeboard is provided between the overflow and inlet such that the inlet is not inundated by design storm flows.
  • Overflow grate matches design specifications.
  • Overflow grates located in high-traffic areas are screwed on or equipped with locks.

Mistakes to Avoid:

  • Backflows – ensure that backflows are avoided by confirming that inlet and overflow elevations match design specifications with surveys.
  • Incorrect sequencing – install overflow drain prior to backfilling with granular material and engineered soil.
  • Incorrect grate material – avoid using plastic overflow grates due to breakages and UV degradation.