Difference between revisions of "Absorbent landscapes"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) |
Jenny Hill (talk | contribs) |
||
Line 19: | Line 19: | ||
==See also== | ==See also== | ||
[[Downspout disconnection]] | *[[Downspout disconnection]] | ||
[[vegetated filter strips]] | *[[vegetated filter strips]] | ||
[[category: infiltration]] | [[category: infiltration]] |
Revision as of 17:50, 12 September 2017
Get excited! This page is going to contain content prepared by Dean Young!
Soil amendment guidelines (from 2010 guide section 3 - placed here by Jen)
Soil amendment sizing criteria: impervious area / soil area = 1
- use 100 mm compost, till to 300 - 450 mm depth
impervious area / soil area = 2
- use 200 mm compost, till to 300 - 450 mm depth
impervious area / soil area = 3
- use 300 mm compost, till to 450 - 600 mm depth
Compost should consist of well-aged (at least one year) leaf compost. Amended soil should have an organic content of 8-15% by weight or 30-40% by volume. Source: Soils for Salmon, 2005
In the meantime, here's a few materials links that may prove useful