Difference between revisions of "Curb cuts"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 10: Line 10:


The width of inlet to capture 100% of this flow is::
The width of inlet to capture 100% of this flow is::
<math>W_T=0.817\times(0.08)^{0.42}\times(0.02)^{0.3}\left (\frac{1}{(0.013)\times(0.03)}\right)^{0.6}</math>
<math>W_T=0.817\times(0.08)^{0.42}\times(0.02)^{0.3}\left (\frac{1}{0.013\times0.03}\right)^{0.6}=9.71 m</math>
   
   



Revision as of 01:13, 29 September 2017

Sizing[edit]

To completely capture linear flow travelling along a gutter perpendicular to a curb inlet, the inlet must be of width::

Where the intention is to capture only a proportion of the flow, the ratio of flow entering the curb inlet may be calculated::

Example[edit]

A curb cut of 3 m is proposed as an inlet for an offline bioretention cell receiving runoff from an adjacent roadway. The gutter and the curb are made from smooth concrete with Manning's 'n' = 0.013. The x-slope is 3% and the longitudinal slope of the road is 2%. The design storm produces flow of 0.08 m3/s.

The width of inlet to capture 100% of this flow is::


Curb cuts Gallery[edit]