Take a look a this address : [https://stormwater.extension.oregonstate.edu/standard-details] There's plenty interesting plans with notes to see how to make important changes to the plans following the field reality!
Take a look a this address : https://stormwater.extension.oregonstate.edu/standard-details There's plenty interesting plans with notes to see how to make important changes to the plans following the field reality!
*Thanks for the reference. We have a few similar resources linked on our [[Drawings]] page.  
*Thanks for the reference. We have this and a few similar resources linked on our [[Drawings]] page.  


'''24 April 2018'''  
'''24 April 2018'''  

Revision as of 17:36, 26 September 2018

31 August 2018 Take a look a this address : https://stormwater.extension.oregonstate.edu/standard-details There's plenty interesting plans with notes to see how to make important changes to the plans following the field reality!

  • Thanks for the reference. We have this and a few similar resources linked on our Drawings page.

24 April 2018

A general feedback from a french user - I do not know the meaning of the acronym LID, used profusely in this article, making it hard to understand. I think it would be very helpful to have a definition for all the acronyms by hovering the mouse cursor over them, just like you did in the sixth paragraph of "Targeting hard surfaces" with the definition of "Rainwater harvesting". This type of definition should be available for all the acronyms used in every other pages of this wiki, at least once per acronym per page.

  • 'LID' has been added to the terms using the same definition for 'Low Impact Development'. We will continue to look for missing information of this type.

10 April 2018

Do you have any specs for designing berms around a bioretention pond?

23 March 2018

Is it possible to get the the planting list updated to include native species?

  • Certainly! This information will be added as we review the plant tables in summer 2018.

21 March 2018

Is there a reliable set of estimated design infiltration rates for sites where only soil type is currently known? Additional tests will be conducted, but for now we are looking for numbers to begin an estimate, and a reasonable basis for those numbers.

  • The curators of Minnesota's stormwater wiki have conducted a very thorough literature review to establish their suggested values for design infiltration rates[1]. The lowest value on their table for clayey soils is 15 mm/hr, we believe that this is a reasonable estimate for clay soils. Designers may wish to add a safety correction to this number before undertaking their design calculations.

  1. Minnesota Stormwater Manual contributors, "Design infiltration rates," Minnesota Stormwater Manual, , https://stormwater.pca.state.mn.us/index.php?title=Design_infiltration_rates&oldid=37031 (accessed May 11, 2018).