Line 132:
Line 132:
|}
|}
===Water volume storage requirements based on catchment type and receiving waters<ref>Toronto and Region Conservation Authority (TRCA), and CH2M Hill Canada. 2018. Inspection and Maintenance Guide for Stormwater Management Ponds and Constructed Wetlands (T van Seters, L Rocha, and K Delidjakovva, Eds.).</ref>===
====
{| class="wikitable"
{| class="wikitable"
|+Water volume storage requirements based on catchment type and receiving waters<ref>Toronto and Region Conservation Authority (TRCA), and CH2M Hill Canada. 2018. Inspection and Maintenance Guide for Stormwater Management Ponds and Constructed Wetlands (T van Seters, L Rocha, and K Delidjakovva, Eds.).</ref>
!rowspan=2|Performance level
!rowspan=2|Performance level
!colspan=4|Storage volume (m<sup>3</sup>/Ha) required according to catchment impervious cover
!colspan=4|Storage volume (m<sup>3</sup>/Ha) required according to catchment impervious cover
Line 147:
Line 148:
|-
|-
|60 % TSS removal||60||60||60||60
|60 % TSS removal||60||60||60||60
|}
|}
===Modeling===
===Modeling===