Notation
Revision as of 18:58, 27 September 2017 by Jenny Hill (talk | contribs)
- m
- run of side slopes in channel cross sections (length, but usually expressed as a ratio in relation to rise. e.g. where side side slopes = 1:3.5, m = 3.5)
- q
- infiltration rate in (length per time, usually mm/hr) (before or after application of safety factor?)
- SCF
- Safety correction factor (dimensionless)
- Ra
- Existing rise of swale gradient (length, usually m)
- Rb
- Rise of compensation gradient for an enhanced swale (length, usually m)