Bioretention: Sizing and modeling
Revision as of 16:38, 10 July 2017 by Jenny Hill (talk | contribs) (Created page with " <ol> <li>Gather input data: <ul> <li>The applicable infiltration coefficient (q) is calculated by applying the safety factor to the Infiltration: Testing|measured infiltra...")
- Gather input data:
- The applicable infiltration coefficient (q) is calculated by applying the safety factor to the measured infiltration rate.
- Determine the drainage catchment area (AD), and outline the location of the bioretention facility. To begin with, budget for at least 10% of the contributing impervious area to be required for the BMP.
- Unless the biomedia fill material has been tested and certified otherwise, a porosity value (Vr) of 0.4 may be assumed (i.e. void ratio 40%).
- Bioretention facilities are usually between 0.5 m and 1.25 m deep, owing to construction considerations. Determine the maximum available depth (cc max) from the site constraints. The Infiltration page lists these.
- Identify the duration (D) and intensity (i) of design storm(s).
- Calculate the required area
<ThirdLeft> <panelWarning> Download .xlsx calculation tool </panelWarning> </ThirdLeft><TwoThirdRight></TwoThirdRight><clearFix></clearFix> <clearFix></clearFix>
<form method="post" action="Media:Infiltration Sizing.xlsx">
<button type="success">Download .xlsx tool</button>
</form>