Notation

From LID SWM Planning and Design Guide
Revision as of 18:58, 27 September 2017 by Jenny Hill (talk | contribs)
Jump to navigation Jump to search
m
run of side slopes in channel cross sections (length, but usually expressed as a ratio in relation to rise. e.g. where side side slopes = 1:3.5, m = 3.5)
q
infiltration rate in (length per time, usually mm/hr) (before or after application of safety factor?)
SCF
Safety correction factor (dimensionless)
Ra
Existing rise of swale gradient (length, usually m)
Rb
Rise of compensation gradient for an enhanced swale (length, usually m)