Infiltration tests must be undertaken at the location, depth and with a head of water that replicates the proposed design.
Catchment area | Consequence of failure | ||
---|---|---|---|
No damage or inconvenience | Minor damage or inconvenience to external structures (e.g. ponding in parking lot) | Significant damage to buildings or infrastructure (e.g. flooding damage) | |
<100 m2 | 1.5 | 2 | 10 |
100 - 1000 m2 | 1.5 | 3 | 10 |
Example[edit]
Where the mean infiltration rate measured at the proposed bottom elevation of the BMP is 30 mm/hr, and the mean infiltration rate measured in an underlying soil horizon within 1.5 m of the bottom is 12 mm/h:
From the table the SCF is 3.5, and the design infiltration rate can be calculated: