All public logs
Jump to navigation
Jump to search
Combined display of all available logs of LID SWM Planning and Design Guide. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
- 16:28, 3 August 2022 Kyle menken talk contribs created page Base course (Created page with "===Base course=== In permeable pavement systems, the base course lies on top of the sub-base reservoir. See the Permeable pavements: Specifications page for base material specifications. The construction steps, key inspection points, and mistakes to avoid for the base course are the same as the guidance given in the storage reservoir section. However, depending on the municipality and the design, compaction of the base course may be required. For example, the City of...")