Enhanced Swales: Construction
This section is also applicable to:
Construction Tasks Table[edit]
Construction Tasks Described[edit]
Verification of Siting and LID Design
Installation of ESC and Construction Fencing
ESC Inspection and Maintenance (ongoing)
Clearing and Grubbing
Excavation
Rough Grade
Verification of Grading/Survey*
Scarification
Geotextile
Impermeable liner
Underdrain
Overflow or Overflow Drain
Monitoring well
Storage Reservoir
Stone Choker Layer
Curbing
Pre-treatment and Inlet
Soil Media / Filter Media
Finish Grading
Riprap (Large Stone)
Plant Material Verification and Installation
Mulch Placement
Stabilizing Contributing Drainage Area - Planting Adjacent Vegetation
As-built Survey
Permanent Fencing
Identify and Address Deficiencies
Assumption/Certification
Key Construction Inspection Points[edit]
Inspection Point Timeline[edit]
Construction Mistakes to Avoid[edit]
You do not have permission to embed PDF files. You do not have permission to embed PDF files. You do not have permission to embed PDF files. You do not have permission to embed PDF files.
Click below to review the following common construction-based mistakes to avoid:
You do not have permission to embed PDF files.