Changes

Jump to navigation Jump to search
no edit summary
Line 22: Line 22:
#The ''maximum'' total depth will be limited by construction practices i.e. usually ≤ 2 m.
#The ''maximum'' total depth will be limited by construction practices i.e. usually ≤ 2 m.
#The ''maximum'' total depth may be limited by the [[Infiltration| conditions underground]] e.g. the groundwater or underlying geology/infrastructure.
#The ''maximum'' total depth may be limited by the [[Infiltration| conditions underground]] e.g. the groundwater or underlying geology/infrastructure.
#The minimum total depth may be limited by the need to support vegetation (e.g. not less than 0.6 m for deep rooting perennials and shrubs).
#The minimum total depth may be limited by the need to support vegetation (e.g. not less than 0.6 m for deeply rooting perennials and shrubs).
#[[Green roofs]], [[absorbent landscapes]] and [[permeable paving]] often receive very little flow from other surfaces, so that the I/P ratio is close to 1.
#[[Green roofs]], [[absorbent landscapes]] and [[permeable paving]] often receive very little flow from other surfaces, so that the I/P ratio is close to 1.
#[[Infiltration trenches]], [[Infiltration chambers| chambers]] and [[bioretention]] have a maximum recommended I/P ratio of 20.
#[[Infiltration trenches]], [[Infiltration chambers| chambers]] and [[bioretention]] have a maximum recommended I/P ratio of 20.

Navigation menu