Changes

Jump to navigation Jump to search
Line 67: Line 67:
==Decide if an underdrain will be included==
==Decide if an underdrain will be included==
* Step 1: Based on the median measured infiltration rate of the native soil at the estimated location and bottom elevation of the practice, or estimated from the median grain-size distribution results, decide if an underdrain will be included in the design.<br>
* Step 1: Based on the median measured infiltration rate of the native soil at the estimated location and bottom elevation of the practice, or estimated from the median grain-size distribution results, decide if an underdrain will be included in the design.<br>
If the field estimated infiltration rate of the underlying native soil (f<sub>f</sub>) is less than 15 mm/h, include an underdrain.
If the median measured or field estimated infiltration rate of the underlying native soil (f<sub>f</sub>) is less than 15 mm/h, include an underdrain.


==Select a surface ponding depth to begin sizing with==
==Select a surface ponding depth to begin sizing with==

Navigation menu