Changes

Jump to navigation Jump to search
no edit summary
Line 18: Line 18:
*Woody [[vegetation]] should not be planted or allowed to become established where snow will be piled/stored during [[Winter]].
*Woody [[vegetation]] should not be planted or allowed to become established where snow will be piled/stored during [[Winter]].
*Removal of sediment from the filter bed surface should be done with rake and shovel, or vacuum equipment to minimize plant disturbance. If a small excavator is to be used, keep it off the BMP footprint to avoid damage to side slopes/embankments and over-compaction of the [[filter media]].
*Removal of sediment from the filter bed surface should be done with rake and shovel, or vacuum equipment to minimize plant disturbance. If a small excavator is to be used, keep it off the BMP footprint to avoid damage to side slopes/embankments and over-compaction of the [[filter media]].
==Key Components & I&M Tasks==


==Key Components and I&M Tasks==
{|class="wikitable"
|+ '''
==Key Components and I&M Tasks==
==Key Components and I&M Tasks==
{|class="wikitable"
{|class="wikitable"
Line 64: Line 59:
|'''[[Bioretention: Construction checklist|Filter Bed]]'''
|'''[[Bioretention: Construction checklist|Filter Bed]]'''
|
|
Flat or gently sloping area composed of a 0.5 to 1 m deep layer of [[filter media]] [[soil]] covered by a mixture of [[vegetation]], [[mulch]] and [[stone]] where [[Bioretention: TTT|surface ponding]] and filtration of runoff occurs.  
Flat or gently sloping area composed of a 0.5 to 1 m deep layer of [[filter media]] soil covered by a mixture of [[vegetation]], [[mulch]] and [[stone]] where [[Bioretention: TTT|surface ponding]] and filtration of runoff occurs.  
|
|
*Check for standing water, barren/eroded areas, sinkholes or animal burrows;
*Check for standing water, barren/eroded areas, sinkholes or animal burrows;

Navigation menu