Line 4: |
Line 4: |
|
| |
|
| ==Construction Tasks Described== | | ==Construction Tasks Described== |
| | '''Verification of Siting and LID Design'''<br> |
| | '''Installation of ESC and Construction Fencing'''<br> |
| | '''ESC Inspection and Maintenance (ongoing)'''<br> |
| | '''Clearing and Grubbing'''<br> |
| | '''Excavation'''<br> |
| | '''Rough Grade'''<br> |
| | '''Verification of Grading/Survey*'''<br> |
| | '''Scarification'''<br> |
| | '''Geotextile'''<br> |
| | '''Impermeable liner'''<br> |
| | '''Underdrain'''<br> |
| | '''Overflow or Overflow Drain'''<br> |
| | '''Monitoring well'''<br> |
| | '''Storage Reservoir'''<br> |
| | '''Stone Choker Layer'''<br> |
| | '''Curbing'''<br> |
| | '''Pre-treatment and Inlet'''<br> |
| | '''Soil Media / Filter Media'''<br> |
| | '''Finish Grading'''<br> |
| | '''Riprap (Large Stone)'''<br> |
| | '''Plant Material Verification and Installation'''<br> |
| | '''Mulch Placement'''<br> |
| | '''Stabilizing Contributing Drainage Area - Planting Adjacent Vegetation'''<br> |
| | '''As-built Survey'''<br> |
| | '''Permanent Fencing'''<br> |
| | '''Identify and Address Deficiencies'''<br> |
| | '''Assumption/Certification'''<br> |
|
| |
|
| ==Key Construction Inspection Points== | | ==Key Construction Inspection Points== |