Changes

Jump to navigation Jump to search
Line 422: Line 422:
|
|
*When part of an Assumption inspection, issue a stop work order and contact the construction site supervisor, design professionals and property owner or project manager to determine follow-up tasks. Follow-up tasks involve scheduling FIT work to do further testing to determine the affected area and depth and decide on corrective actions.
*When part of an Assumption inspection, issue a stop work order and contact the construction site supervisor, design professionals and property owner or project manager to determine follow-up tasks. Follow-up tasks involve scheduling FIT work to do further testing to determine the affected area and depth and decide on corrective actions.
*Corrective actions may involve removal of any accumulated sediment, mulch or stone cover and plantings and tilling of the top 20 to 30 cm of filter media to eliminate surface crusting or macropores and reduce compaction. *Alternatively, removal and replacement of all or the uppermost 15 cm of filter media with material that meets design specifications may be necessary.  
*Corrective actions may involve removal of any accumulated sediment, mulch or stone cover and plantings and tilling of the top 20 to 30 cm of filter media to eliminate surface crusting or macropores and reduce compaction.  
*Alternatively, removal and replacement of all or the uppermost 15 cm of filter media with material that meets design specifications may be necessary.  
|-
|-
|'''[[Permeable pavement|Permeable pavements]]''' (pavement surface)  
|'''[[Permeable pavement|Permeable pavements]]''' (pavement surface)  

Navigation menu