Changes

Jump to navigation Jump to search
Line 110: Line 110:
All exposed soil areas that are not being actively worked must have temporary erosion protection or permanent cover within 7 days for slopes 3:1 or greater and 14 days for slopes 3:1 or greater and 14 days for slopes 3:1 or flatter. This should apply to all exposed soil areas year-round and until the site is stabilized.  
All exposed soil areas that are not being actively worked must have temporary erosion protection or permanent cover within 7 days for slopes 3:1 or greater and 14 days for slopes 3:1 or greater and 14 days for slopes 3:1 or flatter. This should apply to all exposed soil areas year-round and until the site is stabilized.  


Upon arrival:
Upon arrival, make sure to conduct:
Chain of custody
*Chain of custody
Visual inspection
*Visual inspection
Grab a sample, ribbon test
*Grab a sample, ribbon test


===Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)===
===Finishing Grades: Inlet, Outlet, Biomedia, Plants (SPC)===

Navigation menu