Construction Steps:
Construction Steps:
1. Install the underdrain to grade with a consistent slope of 0.5% to 1.0%
#Install the underdrain to grade with a consistent slope of 0.5% to 1.0%
2. Connect overflow risers with single-elbowed ‘y’ connections or 45° elbows
#Connect overflow risers with single-elbowed ‘y’ connections or 45° elbows
3. Situate maintenance risers where siltation is expected in drain lines (such as at junctions or where grade and direction changes occur), in accordance with the design drawings.
#Situate maintenance risers where siltation is expected in drain lines (such as at junctions or where grade and direction changes occur), in accordance with the design drawings.
4. Mark the locations of risers
#Mark the locations of risers
5. Use video inspections to confirm that the interior of the underdrain remains free of debris after construction
#Use video inspections to confirm that the interior of the underdrain remains free of debris after construction


Key Inspection Points:
Key Inspection Points:
Size, type, and material of the underdrain conforms to the design specifications
*Size, type, and material of the underdrain conforms to the design specifications
Underdrain is perforated prior to arrival on-site
*Underdrain is perforated prior to arrival on-site
Drain material is resistant to UV radiation and any chemicals in the soil and groundwater
*Drain material is resistant to UV radiation and any chemicals in the soil and groundwater
Clean-outs are positioned correctly and spaced appropriately for the size of the underdrain
*Clean-outs are positioned correctly and spaced appropriately for the size of the underdrain
Any manual perforations are approved by the design or field engineer
*Any manual perforations are approved by the design or field engineer
Pipe grade matches design specifications
*Pipe grade matches design specifications
Tie-in locations to municipal sewers meet municipal specifications
*Tie-in locations to municipal sewers meet municipal specifications


Mistakes to Avoid:
Mistakes to Avoid:
Incorrect overflow risers – ensure single-elbowed ‘y’ connections or 45° elbows are used for overflow risers instead of ‘T’ connections
*Incorrect overflow risers – ensure single-elbowed ‘y’ connections or 45° elbows are used for overflow risers instead of ‘T’ connections
Incorrect drain size – confirm underdrain has an internal diameter greater than or equal to 200 mm to reduce freezing and allow cleaning and camera inspections
*Incorrect drain size – confirm underdrain has an internal diameter greater than or equal to 200 mm to reduce freezing and allow cleaning and camera inspections
Potential for clogging – Remove sock from underdrain prior to installation or geofabric wrap. A choker course is recommended, instead, as field change
*Potential for clogging – Remove sock from underdrain prior to installation or geofabric wrap. A choker course is recommended, instead, as field change


For more information on the design of under-drains, see the page on under-drains.