Line 2: |
Line 2: |
| Final inspection requirements are in-place to ensure that a final site-wide inspection is performed and that mitigation can occur before the contractor is relieved of responsibility. Final certifications are performed by knowledgeable personnel, such as the design engineer, who are qualified to ensure that LID features are operating as intended. This stage is critically important, as it is the last opportunity for issues to be resolved before the property owner assumes responsibility of the practice. Four (4) levels of inspection exist for final inspections of LID infiltration and filtration practices.<ref>https://cvc.ca/wp-content/uploads//2021/07/2016-04-21-web-version-CVCbioretentionCertificationProtocols.pdf</ref> The level of inspection, or combination of tests, that is selected is dependent on the goals of the assessment and feasibility of each inspection. | | Final inspection requirements are in-place to ensure that a final site-wide inspection is performed and that mitigation can occur before the contractor is relieved of responsibility. Final certifications are performed by knowledgeable personnel, such as the design engineer, who are qualified to ensure that LID features are operating as intended. This stage is critically important, as it is the last opportunity for issues to be resolved before the property owner assumes responsibility of the practice. Four (4) levels of inspection exist for final inspections of LID infiltration and filtration practices.<ref>https://cvc.ca/wp-content/uploads//2021/07/2016-04-21-web-version-CVCbioretentionCertificationProtocols.pdf</ref> The level of inspection, or combination of tests, that is selected is dependent on the goals of the assessment and feasibility of each inspection. |
|
| |
|
| '''Visual Inspection (Level 1)''' | | '''Visual Inspection (Level 1)'''<br> |
| This qualitative method is low cost and requires minimal effort to conduct. Visual inspection should be used as an initial step to determine if the LID practice is operating properly. Visual inspections can be performed during dry weather and wet weather to examine various aspects of LID performance, such as the following: | | This qualitative method is low cost and requires minimal effort to conduct. Visual inspection should be used as an initial step to determine if the LID practice is operating properly. Visual inspections can be performed during dry weather and wet weather to examine various aspects of LID performance, such as the following: |
| *draw-down time | | *draw-down time |
Line 10: |
Line 10: |
| *sedimentation | | *sedimentation |
|
| |
|
| '''Surface Infiltration Capacity Testing (Level 2)''' | | '''Surface Infiltration Capacity Testing (Level 2)'''<br> |
| Level 2 includes the employment of quantitive methods of testing and data collection. These tasks are also cost-effective and can establish if the LID feature was built in conformance with the design specifications. Some level 2 tests include the following: | | Level 2 includes the employment of quantitive methods of testing and data collection. These tasks are also cost-effective and can establish if the LID feature was built in conformance with the design specifications. Some level 2 tests include the following: |
| *soil sampling and testing | | *soil sampling and testing |
Line 24: |
Line 24: |
| </gallery> | | </gallery> |
|
| |
|
| '''Continuous Water Level Monitoring (Level 3)''' | | '''Continuous Water Level Monitoring (Level 3)'''<br> |
| Site infiltration rates can be measured with greater accuracy through continuous water level monitoring. This monitoring approach evaluates seasonal infiltration performance through the monitoring of temperature and groundwater levels. The following conditions and equipment are necessary for continuous water level monitoring: | | Site infiltration rates can be measured with greater accuracy through continuous water level monitoring. This monitoring approach evaluates seasonal infiltration performance through the monitoring of temperature and groundwater levels. The following conditions and equipment are necessary for continuous water level monitoring: |
| #A perforated observation well | | #A perforated observation well |
Line 33: |
Line 33: |
|
| |
|
| [[File:Large bioretention Meadows in the Glen .JPG|300px|thumb|right|rainfall data and water level measurements can be used to assess infiltration performance.]] | | [[File:Large bioretention Meadows in the Glen .JPG|300px|thumb|right|rainfall data and water level measurements can be used to assess infiltration performance.]] |
| '''Long-term Monitoring (Level 4)''' | | '''Long-term Monitoring (Level 4)'''<br> |
| High-intensity monitoring is a comprehensive but expensive approach to assessing peak flow reduction and water volume reduction during natural runoff events. These reductions can be quantified by completing a water budget during natural storm events, specifically through the measurement of inflow and outflow. Pollutant load reductions can also be quantified with the appropriate technology. Long-term monitoring is especially recommended if the LID feature that is the subject of the test is the first of its kind in its given jurisdiction, if geologic conditions pose a concern, or if the feature is being implemented to protect sensitive and significant natural features. | | High-intensity monitoring is a comprehensive but expensive approach to assessing peak flow reduction and water volume reduction during natural runoff events. These reductions can be quantified by completing a water budget during natural storm events, specifically through the measurement of inflow and outflow. Pollutant load reductions can also be quantified with the appropriate technology. Long-term monitoring is especially recommended if the LID feature that is the subject of the test is the first of its kind in its given jurisdiction, if geologic conditions pose a concern, or if the feature is being implemented to protect sensitive and significant natural features. |
|
| |
|