Changes

Jump to navigation Jump to search
no edit summary
Line 10: Line 10:
#Provide sufficient curing time, according to CSA standard A23.1-09.
#Provide sufficient curing time, according to CSA standard A23.1-09.


[[File:20150618 114542.jpg|thumb|500px|right|Caption]]
[[File:P1160129.JPG|thumb|400px|right|Caption]]
'''Key Inspection Points:'''     
'''Key Inspection Points:'''     
*Use of proper curb form by sub-contractor.
*Use of proper curb form by sub-contractor.
Line 16: Line 18:
*Designated concrete wash out is in place and away from LID facility.
*Designated concrete wash out is in place and away from LID facility.


[[File:20150618 114542.jpg|thumb|500px|right|Caption]]
[[File:P1160129.JPG|thumb|400px|right|Caption]]
'''Mistakes to Avoid:<br>'''
'''Mistakes to Avoid:<br>'''
*Elevated curb cuts and reverse slopes (sloping from back of curb towards instead of depressing from gutter line towards the back).
*Elevated curb cuts and reverse slopes (sloping from back of curb towards instead of depressing from gutter line towards the back).

Navigation menu