|+ Be sure to verify all design changes
|+ Be sure to verify all design changes
|-
|-
|[[File:T-junction_photo.jpg|320px|thumb|center]][[File:Y-junction design detail.png|280px|thumb|center]]
|[[File:T-junction_photo.jpg|320px]][[File:Y-junction design detail.png|280px]]
|-
|-
|A simple departure from the design—installing a T-junction in place of a Y-junction—would have made it extremely difficult or impossible to inspect this underdrain and flush it out.
|A simple departure from the design—installing a T-junction in place of a Y-junction—would have made it extremely difficult or impossible to inspect this underdrain and flush it out.
|-
|-
|}
|}
 
</br>
After securing a contractor, a pre-construction meeting between the project manager, project engineer, and contractor will facilitate an efficient job site and reduce the potential for miscommunication. These meetings should cover:
After securing a contractor, a pre-construction meeting between the project manager, project engineer, and contractor will facilitate an efficient job site and reduce the potential for miscommunication. These meetings should cover: