==Overview==
==Overview==
*
*''Importance of construction inspections''
*''Importance of construction inspections''
*''Building capacity in the construction industry''
*




STEP divides the construction process for LID practices into five categories:  
STEP divides the construction process for LID practices into five categories:  
#Pre-construction
#Pre-construction
#Excavation and grading
#Excavation and grading
Line 14: Line 14:
#Post-construction
#Post-construction


[[Pre-construction]]
The first three categories of construction process are fundamentally the same for all ground-level LID types. For example, the STEP-recommended processes for excavation do not differ between practice type: excavation is excavation, whether it is for a bioretention or a permeable paver facility.