Changes

Jump to navigation Jump to search
m
Line 15: Line 15:
#Post-construction
#Post-construction


Stages 1-3 and 5 of the LID construction process are fundamentally similar for all '''surface-level LID''' types (bioretention, bioswales, enhanced grass swales, permeable pavements, infiltration chambers, infiltration trenches, soakaways, etc.). To illustrate, STEP's recommended processes for excavation do not differ depending on the practice type. Excavation is excavation, whether it is for a bioretention garden or a permeable paver parking lot. On the other hand, stage 4 sub-tasks will vary substantially from practice to practice, as do some sub-tasks in stage 3. The following section gives a brief explanation of each over-arching stage and links to the pages dedicated to each construction stage.  
Stages 1-3 and 5 of the LID construction process are fundamentally similar for all '''surface-level LID''' types (bioretention, bioswales, enhanced grass swales, permeable pavements, infiltration chambers, infiltration trenches, soakaways, etc.). To illustrate, STEP's recommended processes for excavation do not differ depending on the practice type. Excavation is excavation, whether it is for a bioretention garden or a permeable pavement parking lot. On the other hand, stage 4 sub-tasks will vary substantially from practice to practice, as do some sub-tasks in stage 3. The following gives a brief explanation of each over-arching stage and links to the pages dedicated to each construction stage.  


===Pre-construction===
===Pre-construction===
Pre-construction activities set the stage for the successful construction of '''an LID''' practice. The pre-construction page gives guidance on:  
Pre-construction activities set the stage for the successful construction of '''an LID''' practice. The [[Pre-construction|pre-construction]] page gives guidance on:  
*design verification and site walk-through
*design verification and site walk-through
*LID construction notes
*LID construction notes
Line 27: Line 27:
    
    
===Excavation and grading===  
===Excavation and grading===  
Excavation and grading are necessary for installing LID practices with sub-surface components, re-grading land to hold more water, and re-routing overland flow routes into an LID practice. The excavation and grading page gives guidance on:  
Excavation and grading are necessary for installing LID practices with sub-surface components, re-grading land to hold more water, and re-routing overland flow routes into an LID practice. The [[Excavation and grading|excavation and grading]] page gives guidance on:  
*clearing and grubbing
*clearing and grubbing
*excavation and rough grade
*excavation and rough grade
722

edits

Navigation menu