Line 51: Line 51:
*pre-treatment and inlet
*pre-treatment and inlet


===Finishing grades and surface layer installation===
==Finishing grades and surface layer installation==
This construction stage differs between LID practice type. The finishing grades and surface layer installation page has guidance for vegetated LIDS (bioretention, bioswales, enhanced grass swales, and vegetated filter strips; can also include infiltration chambers/trenches/soakaways, depending on the design) and permeable pavements.
This construction stage differs between LID practice type. The finishing grades and surface layer installation page has guidance for vegetated LIDS (bioretention, bioswales, enhanced grass swales, and vegetated filter strips; can also include infiltration chambers/trenches/soakaways, depending on the design) and permeable pavements.


Line 104: Line 104:

|}
|}


===Post-construction===
===Post-construction===