==Finishing grades and surface layer installation==
==Finishing grades and surface layer installation==
This construction stage differs between LID practice type. The [[finishing grades and surface layer installation: vegetated LIDs]] page has guidance for vegetated LIDs, and the '''finishing grades and surface layer installation: permeable pavements''' page has guidance for and non-vegetated LIDs. In many cases the surface of infiltration systems will be traditional asphalt, concrete, or pavers; STEP does not provide guidance on installing non-permeable surfaces.   
This construction stage differs between LID practice type. The [[finishing grades and surface layer installation: vegetated LIDs]] page has guidance for vegetated LIDs, and the '''[[finishing grades and surface layer installation: permeable pavements]]''' page has guidance for and non-vegetated LIDs. In many cases the surface of infiltration systems will be traditional asphalt, concrete, or pavers; STEP does not provide guidance on installing non-permeable surfaces.   


{| class="wikitable"
{| class="wikitable"
Line 65: Line 65:
|-
|-
|soil media installation and soil amendments
|soil media installation and soil amendments
| PP
|bedding layer


|-
|-
|finish grading
|finish grading
| PP
|placement and finishing


|-
|-
|large stone and riprap
|large stone and riprap
|PP
|paver installation


|-
|-
|plant verification and installation
|plant verification and installation
|PP
|tamping


|-
|-
|mulch placement
|mulch placement
|pp
|joint cutting


|-
|-
|stabilizing contributing drainage area and planting adjacent vegetation
|stabilizing contributing drainage area and planting adjacent vegetation
|PP
|joint aggregate


|-
|-
|as-built survey
|as-built survey
|PP
|curbing
 
|-
|
|stabilizing contributing drainage area


|}
|}