Changes

Jump to navigation Jump to search
m
Line 100: Line 100:

==Post-construction==
==Post-construction==
If you assume the works too early, u make an ass out of me.
Post-construction tasks ensure that the LID practice was built to specs and that any outstanding issues with it are resolved before assumption. The [[post-construction]] page give guidance on:
 
*Addressing deficiencies
*Final certification


==LID practice pages==
==LID practice pages==
722

edits

Navigation menu