Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
Construction
(view source)
Revision as of 17:32, 11 August 2022
No change in size
,
2 years ago
m
no edit summary
Line 12:
Line 12:
*the LID practice has the proper layout, location, footprint, and volume;
*the LID practice has the proper layout, location, footprint, and volume;
*materials meet design specifications;
*materials meet design specifications;
*material substitutions and
any
field changes to the design are verified and documented;
*
any
material substitutions and field changes to the design are verified and documented;
*the contributing drainage area is stabilized before the LID practice becomes operational;
*the contributing drainage area is stabilized before the LID practice becomes operational;
*environmentally sensitive areas and the LID practices themselves are protected during construction; and
*environmentally sensitive areas and the LID practices themselves are protected during construction; and
Kyle menken
722
edits
Navigation menu
Personal tools
Log in
Namespaces
Page
Discussion
Variants
expanded
collapsed
Views
Read
View source
View history
More
expanded
collapsed
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version