Changes

Jump to navigation Jump to search
Line 15: Line 15:
*Where flow comes off an impervious surface, a drop of 75 mm or more to the surface level of the diaphragm is recommended,
*Where flow comes off an impervious surface, a drop of 75 mm or more to the surface level of the diaphragm is recommended,
*Typical dimensions for the trench excavation are 300 mm deep and 600 mm wide. The trench may be any length,  
*Typical dimensions for the trench excavation are 300 mm deep and 600 mm wide. The trench may be any length,  
*The trench should be lined with before filling with gravel,   
*The trench should be lined with geotextile before filling with gravel,   
*River rock or decorative aggregate may be included in a layer at the top of the gravel fill, for aesthetic value.  
*River rock or decorative aggregate may be included in a layer at the top of the gravel fill, for aesthetic value.  


===Materials===
===Materials===
<h4>Geotextile</h4>
<h4>Geotextile</h4>
{{:geotextiles}}
{{:geotextiles}}

Navigation menu