Line 22: Line 22:
*the contributing drainage area is stabilized before the LID practice becomes operational;
*the contributing drainage area is stabilized before the LID practice becomes operational;
*environmentally sensitive areas and the LID practices themselves are protected during construction; and
*environmentally sensitive areas and the LID practices themselves are protected during construction; and
*[[inlet]], outlet, [[pretreatment]], and piped elements have the correct elevations and inverts.   
*[[inlet]], outlet, [[pretreatment]], and [[pipes|piped]] elements have the correct elevations and inverts.   


Furthermore, keeping records of these inspections helps to certify the works after construction and makes for a smooth assumption process.
Furthermore, keeping records of these inspections helps to certify the works after construction and makes for a smooth assumption process.
Line 41: Line 41:
For this reason, Stages 1-2 and 5 of the LID construction process are fundamentally similar for all sub-surface and ground-level LID types. To illustrate, STEP's recommended processes for excavation do not differ between LID practice types. Excavation procedures are the same, whether for a bioretention garden or a permeable pavement parking lot. On the other hand, stage 4 sub-tasks will vary depending on whether the LID practice's surface is vegetated or permeable pavement. Some sub-tasks in stage 3 will also vary depending on the LID type. For example, permeable pavements often require compaction of sub-surface storage layers. The following sections give a brief description of each over-arching stage, a list of sub-tasks for each stage, and links to the page dedicated to each main LID construction stage.
For this reason, Stages 1-2 and 5 of the LID construction process are fundamentally similar for all sub-surface and ground-level LID types. To illustrate, STEP's recommended processes for excavation do not differ between LID practice types. Excavation procedures are the same, whether for a bioretention garden or a permeable pavement parking lot. On the other hand, stage 4 sub-tasks will vary depending on whether the LID practice's surface is vegetated or permeable pavement. Some sub-tasks in stage 3 will also vary depending on the LID type. For example, permeable pavements often require compaction of sub-surface storage layers. The following sections give a brief description of each over-arching stage, a list of sub-tasks for each stage, and links to the page dedicated to each main LID construction stage.


[[Green roof|Green roofs]], [[stormwater planters]], and [[rainwater harvesting]] systems have specific construction sequences and requirements that differ from the main sequence described above. STEP has developed guidance for [[green roof construction]]. When installing these BMP types, always consult the product manufacturer's guidance.
[[Green roof|Green roofs]] and [[rainwater harvesting]] systems have specific construction sequences and requirements that differ from the main sequence described above. STEP has developed guidance for [[green roof construction]]; '''guidance on installing rainwater harvesting practices is forthcoming'''. When installing these BMP types, always consult the product manufacturer's guidance.


==Pre-construction==
==Pre-construction==
Line 67: Line 67:
The [[sub-surface components]] page gives guidance on:  
The [[sub-surface components]] page gives guidance on:  


*geotextile
*[[geotextile]]
*underdrain
*[[underdrain]]
*impermeable liners
*[[liner|impermeable liner]]
*overflow
*[[overflow]]
*monitoring wells
*[[wells|monitoring wells]]
*storage reservoir
*storage reservoir
**sub-base reservoir (permeable pavements)
**sub-base reservoir (permeable pavements)
**base course (permeable pavements)
**base course (permeable pavements)
**infiltration chamber installation
**[[infiltration chambers]]
*stone choker layer
*[[choker layer]]
*curbing
*curbing and [[curb cuts]]
*pre-treatment and inlet
*[[pretreatment]] and [[inlets]]


==Finishing grades and surface layer installation==
==Finishing grades and surface layer installation==