Changes
Jump to navigation
Jump to search
← Older edit
Pre-construction
(view source)
Revision as of 21:29, 22 September 2022
No change in size
,
2 years ago
→Mobilization, access, staging, and perimeter controls
Line 276:
Line 276:
*Ensure perimeter fencing and access/staging areas are in alignment with design drawings.
*Ensure perimeter fencing and access/staging areas are in alignment with design drawings.
'''Mistakes to avoid'''
'''Mistakes to avoid'''
#
Departing from the plan to stage and limit access points, material storage areas, and equipment storage areas
*
Departing from the plan to stage and limit access points, material storage areas, and equipment storage areas
#
Installing inadequate perimeter controls, e.g. inadequate sediment fencing or construction fencing
*
Installing inadequate perimeter controls, e.g. inadequate sediment fencing or construction fencing
==References==
==References==
SamanthaPelayo
502
edits
Navigation menu
Personal tools
Log in
Namespaces
Page
Discussion
Variants
expanded
collapsed
Views
Read
View source
View history
More
expanded
collapsed
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version