Changes

Jump to navigation Jump to search
no edit summary
Line 15: Line 15:

'''Mistakes to Avoid:'''
'''Mistakes to Avoid:'''
*Incorrect sequencing – ensure that standpipe is installed prior to backfilling with granular material.
*Incorrect sequencing: Ensure that standpipe is installed prior to backfilling with granular material.

Navigation menu