Changes

Jump to navigation Jump to search
no edit summary
Line 23: Line 23:
<gallery mode="packed" widths=300px heights=300px>
<gallery mode="packed" widths=300px heights=300px>
geotextile-facility-side.jpg | The shape of the LID feature required the geotextile to be rolled out prior to being laid on the subgrade surface. (Photo Source: CVC, 2012)
geotextile-facility-side.jpg | The shape of the LID feature required the geotextile to be rolled out prior to being laid on the subgrade surface. (Photo Source: CVC, 2012)
geotextile-with-excess-and-granular.jpg | Excess fabric is draped over the edges of the LID practice, and backfilling with granular is taking place. (Photo Source: CVC, '''year''')
geotextile-with-excess-and-granular.jpg | Excess fabric is draped over the edges of the LID practice, and backfilling with granular is taking place. (Photo Source: CVC, 2012)
geotextile-backfill-underdrain.jpg | Footprint with geotextile, granular, and underdrain. (Photo Source: CVC, '''year''')
geotextile-backfill-underdrain.jpg | Footprint with geotextile, granular, and underdrain. (Photo Source: CVC, '''year''')


426

edits

Navigation menu