| <small>'''Note''': All practice cost estimates are based on a Contributing Drainage Area (CDA) of 2000 m<sup>2</sup>, runoff retention or treatment depth of 25 mm, and a drainage period of 72 hours. For infiltration practices, native soil infiltration rates for Full, Partial and No Infiltration Design scenarios were assumed to be 20 mm/h, 10 mm/h and 2 mm/h, respectively, and a safety factor of 2.5 was applied to calculate the design infiltration rate. Construction cost estimates assume the practice is built as part of an overall greenfield site construction project so do not include equipment mobilization/demobilization costs, nor additional costs associated with retrofit/redevelopment scenarios. Operation and maintenance (O&M) cost estimates assume annual inspections, removal of trash and debris twice a year, removal of sediment from pretreatment structures annually, and removal of weeds twice a year (where applicable). Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 years to confirm adequate drainage performance through in-situ surface infiltration rate testing (where applicable).</small> | | <small>'''Note''': All practice cost estimates are based on a Contributing Drainage Area (CDA) of 2000 m<sup>2</sup>, runoff retention or treatment depth of 25 mm, and a drainage period of 72 hours. For infiltration practices, native soil infiltration rates for Full, Partial and No Infiltration Design scenarios were assumed to be 20 mm/h, 10 mm/h and 2 mm/h, respectively, and a safety factor of 2.5 was applied to calculate the design infiltration rate. Construction cost estimates assume the practice is built as part of an overall greenfield site construction project so do not include equipment mobilization/demobilization costs, nor additional costs associated with retrofit/redevelopment scenarios. Operation and maintenance (O&M) cost estimates assume annual inspections, removal of trash and debris twice a year, removal of sediment from pretreatment structures annually, and removal of weeds twice a year (where applicable). Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 years to confirm adequate drainage performance through in-situ surface infiltration rate testing (where applicable).</small> |