Changes

Jump to navigation Jump to search
Line 48: Line 48:
#[[Stormwater planters| Bioretention: No infiltration]],  
#[[Stormwater planters| Bioretention: No infiltration]],  


As can be seen, regardless of design configuration, Material & Installation expenses represent the largest portion of total construction costs.
As can be seen, regardless of design configuration, Material & Installation expenses represent the largest portion of total construction costs (75 to 79%).


==Life Cycle Costs==
==Life Cycle Costs==

Navigation menu