| The information found here relates to '''Permeable Interlocking Concrete Pavers (PICP)''', for costs and information associated with [[LID LCCT: Porous Asphalt|Porous Asphalt click here]]. STEP has prepared life cycle costs estimates for each design configuration, based on a drainage area composed of 1,000 m<sup>2</sup> of conventional asphalt and 1,000 m<sup>2</sup> of permeable pavers, runoff control target of 25 mm depth and 72 hour drainage period, for comparison which can be viewed below. To generate your own life cycle cost estimates customized to the development context, design criteria, and constraints applicable to your site, access the updated [https://sustainabletechnologies.ca/lid-lcct/ LID Life Cycle Costing Tool (LCCT) here]. | | The information found here relates to '''Permeable Interlocking Concrete Pavers (PICP)'''. For costs and information associated with [[LID LCCT: Porous Asphalt|Porous Asphalt click here]]. STEP has prepared life cycle costs estimates for each design configuration, based on a drainage area composed of 1,000 m<sup>2</sup> of conventional asphalt and 1,000 m<sup>2</sup> of permeable pavers, runoff control target of 25 mm depth and 72 hour drainage period, for comparison which can be viewed below. To generate your own life cycle cost estimates customized to the development context, design criteria, and constraints applicable to your site, access the updated [https://sustainabletechnologies.ca/lid-lcct/ LID Life Cycle Costing Tool (LCCT) here]. |