| ==Construction Costs== | | ==Construction Costs== |
|
| |
|
| [[File:Construction Breakdown PP No Infil.PNG|thumb|right|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - No Infiltration Design, 25 mm Retention''']] | | [[File:Construction Breakdown PA No Infil.PNG|thumb|right|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - No Infiltration Design, 25 mm Retention''']] |
|
| |
|
| [[File:Construction Breakdown PP Full Infil.PNG|thumb|left|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']] | | [[File:Construction Breakdown PA Full Infil.PNG|thumb|left|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']] |
|
| |
|
| [[File:Construction Breakdown PP Partial Infil.PNG|thumb|center|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Partial Infiltration Design, 25 mm Retention''']] | | [[File:Construction Breakdown PA Partial Infil.PNG|thumb|center|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Partial Infiltration Design, 25 mm Retention''']] |
|
| |
|
|
| |
|
Line 55: |
Line 55: |
|
| |
|
| Above you can find a cost breakdown of a 1000m<sup>2</sup> in three different configurations:<br> | | Above you can find a cost breakdown of a 1000m<sup>2</sup> in three different configurations:<br> |
| #[[Permeable pavements#Design|Non-infiltrating/filtration only Permeable Pavement]], | | #[[Permeable pavements#Design|Non-infiltrating/filtration only Porous Asphalt]], |
| #[[Permeable pavements#Design|Partial infiltration Permeable Pavement]] | | #[[Permeable pavements#Design|Partial infiltration Porous Asphalt]] |
| #[[Permeable pavements#Design|Full infiltration Permeable Pavement]] | | #[[Permeable pavements#Design|Full infiltration Porous Asphalt]] |
|
| |
|
| As can be seen the greatest cost for this practice (regardless of configuration type) will be Material & Installation, which include costly components such as the, [[Liner|impermeable membrane/liner]], the [[underdrain]], the [[Permeable pavements#Foundation Aggregates|sub-base]] of 50mm [[clear stone]], base of 19mm [[clear stone]] and the [[Bedding layer|bedding pavers themselves]]. | | As can be seen the greatest cost for this practice (regardless of configuration type) will be Material & Installation, which include costly components such as the, [[Liner|impermeable membrane/liner]], the [[underdrain]], the [[Permeable pavements#Foundation Aggregates|sub-base]] of 50mm [[clear stone]], base of 19mm [[clear stone]] and the [[Bedding layer|bedding pavers themselves]]. |