| Below are capital and life cycle cost estimates for the [[Enhanced swales]] Full Infiltration configuration over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values. Operation and maintenance costs are predicted to represent 45% of total life cycle costs over the 25-year evaluation period, and increase to 59% of total life cycle costs over the 50-year period, due to increased levels of litter removal, watering (establishment period - years 1 & 2 / annually and / drought watering) cleaning out and vacuuming of the catchbasin, mowing, replacement of sod, weeding and pruning of the BMP's planted [[vegetation]]. | | Below are capital and life cycle cost estimates for an [[Rainwater harvesting|Underground Rainwater Cistern]], Non-Infiltrating configuration over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values. Operation and maintenance costs are predicted to represent 18% of total life cycle costs over the 25-year evaluation period, and increase to 24% of total life cycle costs over the 50-year period, due to increased levels of litter removal, watering (establishment period - years 1 & 2 / annually and / drought watering) cleaning out and vacuuming of the catchbasin, mowing, replacement of sod, weeding and pruning of the BMP's planted [[vegetation]]. |