Changes

Jump to navigation Jump to search
no edit summary
Line 8: Line 8:
*[[Bioswales]] (surface)
*[[Bioswales]] (surface)
}}
}}
----
===Constraints===
===Constraints===
Infiltration practices are not recommended:
Infiltration practices are not recommended:
Line 25: Line 26:
*[[Bioretention:_Partial_infiltration|Partially infiltrating bioretention]]
*[[Bioretention:_Partial_infiltration|Partially infiltrating bioretention]]
}}
}}
----
 
{{TextBox|1= Where infiltration is impossible, LID design alternatives exist which can still capture and retain  stormwater:
{{TextBox|1= Where infiltration is impossible, LID design alternatives exist which can still capture and retain  stormwater:
*[[Bioretention: Non-infiltrating | Stormwater planters]]
*[[Bioretention: Non-infiltrating | Stormwater planters]]
Line 31: Line 32:
*[[Green roofs]]
*[[Green roofs]]
}}
}}
----
===Planning===
===Planning===
NEW CONTENT HERE?
<h4>Soil infiltration rate</h4>
<h4>Soil infiltration rate</h4>
[[Infiltration: Testing|Infiltration tests]] must be undertaken at the location, depth and with a head of water that replicates the proposed design.  
[[Infiltration: Testing|Infiltration tests]] must be undertaken at the location, depth and with a head of water that replicates the proposed design.  

Navigation menu