==Incentives and Credits==
==Incentives and Credits==
<h3>In Ontario</h3>
<h3>In Ontario</h3>
<strong>City of Mississauga</strong><br>
'''City of Mississauga'''
The City of Mississauga has a stormwater management credit program which includes RWH as one of their recommended site strategies[https://www.mississauga.ca/portal/services/credit-program].  
The City of Mississauga has a stormwater management credit program which includes RWH as one of their recommended site strategies[https://www.mississauga.ca/portal/services/credit-program].  
<br>
<h3>LEED BD + C v. 4</h3>
<h3>LEED BD + C v. 4</h3>
<strong>Water Efficiency: Rainwater management  (up to 3 points)</strong><br>
'''Water Efficiency: Rainwater management  (up to 3 points)'''
Note that for lines 1. and 2. preference is given to LID that 'best replicates natural site hydrology':
Note that for lines 1. and 2. preference is given to LID that 'best replicates natural site hydrology':
*Two points (or 1 point for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 95th percentile of regional or local rainfall events."
*Two points (or 1 point for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 95th percentile of regional or local rainfall events."
*Three points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 98th percentile of regional or local rainfall events."  
*Three points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 98th percentile of regional or local rainfall events."  
<strong>OR</strong>
''OR''
For zero-lot-line projects only, 3 points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 85th percentile of regional or local rainfall events."
For zero-lot-line projects only, 3 points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 85th percentile of regional or local rainfall events."
This last clause relating to zero-lot-line projects is where RWH may prove most applicable compared to other LID.</p>
This last clause relating to zero-lot-line projects is where RWH may prove most applicable compared to other LID.
<strong>Pilot Credits: Whole Project Water Use Reduction (up to 10 points)</strong> <br>
'''Pilot Credits: Whole Project Water Use Reduction (up to 10 points)'''
This pilot credit requires whole building  water use modeling to demonstrate reduced water use compared to a baseline model. <br>
This pilot credit requires whole building  water use modeling to demonstrate reduced water use compared to a baseline model.
A sliding scale awards between 1 point for 10% reduction to 10 points for 65% reduction.  
A sliding scale awards between 1 point for 10% reduction to 10 points for 65% reduction.  
Making this kind of water use reduction would typically require reuse of [[greywater]] as well as an optimized RWH plan.