Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1:
Runoff Volume Control Target (RVC<sub>T</sub>)  
Runoff Volume Control Target (RVC<sub>T</sub>)  
<br>
{{textbox|1="The means to achieve the RVC<sub>T</sub> includes:<br>
{{TextBox|1="The means to achieve the RVC<sub>T</sub> includes:<br>
a)'''Retention''' - where the captured volume shall be ultimately infiltrated, evapotranspired or re-used and the specified volume will not later be discharged to sewer networks (with the exception of internal water re-use activities) or surface waters and does not therefore become runoff,
a) <strong>Retention</strong> - where the captured volume shall be ultimately infiltrated, evapotranspired or re-used and the specified volume will not later be discharged to sewer networks (with the exception of internal water re-use activities) or surface waters and does not therefore become runoff,
and<br>
and<br>
b) <strong>Volume Capture and Treatment</strong> - Also referred to as `treatment and release`, where the volume capture and treatment directly aims at reducing surface water impairment through treatment of the specified volume, often referred to as a “water quality volume”.<ref>MOECC (2018)</ref>}}
b)'''Volume Capture and Treatment''' - Also referred to as `treatment and release`, where the volume capture and treatment directly aims at reducing surface water impairment through treatment of the specified volume, often referred to as a “water quality volume”.<ref>MOECC (2018)</ref>}}


<references/>
<references/>


Page to include image of the 90th percentile
Page to include image of the 90th percentile

Navigation menu