Changes

Jump to navigation Jump to search
Line 69: Line 69:

=== Assess Effectiveness ===
=== Assess Effectiveness ===
Once the suite of best management practices have been selected and the models have
been run, a comparison of the results and the environmental design criteria can be
made. An iterative approach, which involves adjusting the size or adding/deleting BMPs
should be used until the environmental design criteria are met. The project can then
proceed to the detailed design stage.


=== Meets Design Criteria ===
=== Meets Design Criteria ===


=== Proceed to Detailed Design ===
=== Proceed to Detailed Design ===
187

edits

Navigation menu