Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
LID opportunities in road-right-of-ways
(view source)
Revision as of 13:21, 26 September 2017
19 bytes added
,
7 years ago
→Urban Cross-Section
Line 37:
Line 37:
*Utility lines may be in separate or shared trenches
*Utility lines may be in separate or shared trenches
Typical LID opportunities Within the roadway:
===
Typical LID opportunities
===
*Curb extension bioretention is a good method for
'''
Within the roadway:
'''
calming traffic and using underutilized parking zones
*Curb extension bioretention is a good method for calming traffic and using underutilized parking zones
*Due to low speeds and low traffic, permeable pavement can be used for the roadway from curb to curb
*Due to low speeds and low traffic, permeable pavement can be used for the roadway from curb to curb
Within the boulevard:
'''
Within the boulevard:
'''
*Boulevard bioretention can be easily incorporated into a rural to urban upgrade by allowing for
stormwatertreatment
within the boulevard space
*Boulevard bioretention can be easily incorporated into a rural to urban upgrade by allowing for
stormwater treatment
within the boulevard space
==Residential collector road==
==Residential collector road==
JakubW
106
edits
Navigation menu
Personal tools
Log in
Namespaces
Page
Discussion
Variants
expanded
collapsed
Views
Read
View source
View history
More
expanded
collapsed
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version