Changes

Jump to navigation Jump to search
m
no edit summary
Line 1: Line 1:
Understanding site conditions is critical when [[Screening LID Options]]. Gaining comprehensive knowledge of the proposed site requires a desktop review of relevant background information followed by field reconnaissance to verify the review and identify site conditions not included in background information.   
Understanding site conditions is critical when [[Screening LID Options]]. Gaining comprehensive knowledge of the proposed site requires a desktop review of relevant background information followed by field reconnaissance to verify the review and identify site conditions not included in background information.   
== Desktop Analysis of Background Information ==
== Desktop Analysis of Background Information ==
Line 5: Line 4:

Relevant background information may include:
Relevant background information may include:
* Construction drawings from site and adjacent properties
* Construction drawings from site and adjacent properties
* Mechanical drawings identifying rain leader piping
* Mechanical drawings identifying rain leader piping
Line 27: Line 25:
* Neighbouring landscapes
* Neighbouring landscapes
* Landowner/company vision and priorities
* Landowner/company vision and priorities
== Field Reconnaissance of Site Conditions ==
== Field Reconnaissance of Site Conditions ==
When documenting side conditions for commercial, industrial, and multi-residential sites, investigate the following:
When documenting side conditions for commercial, industrial, and multi-residential sites, investigate the following:
* Drainage and grade
* Drainage and grade
* Roof tops
* Roof tops
722

edits

Navigation menu