Line 38: Line 38:
|Drainage Area  
|Drainage Area  
|Sustaining vegetation, volumetric turnover
|Sustaining vegetation, volumetric turnover
|5 Ha (≥10 Ha preferred)
|style="text-align: left|5 Ha (≥10 Ha preferred)
|-
|-
|Treatment Volume  
|Treatment Volume  
|Provision of appropriate level of protection (Table 3.2)
|Provision of appropriate level of protection (Table 3.2)
|See Table 3.2
|style="text-align: left|See Table 3.2
|-
|-
|Active Storage
|Active Storage
|Detention
|Detention
|Suspended solids settling 24 hrs (12 hrs if in conflict with min. orifice size)
|style="text-align: left|Suspended solids settling 24 hrs (12 hrs if in conflict with min. orifice size)
|-
|-
|Forebay  
|Forebay  
|Pre-treatment  
|Pre-treatment  
|
|style="text-align: left|
#Minimum depth: 1 m;
#Minimum depth: 1 m;
#Sized to ensure non-erosive velocities leaving forebay;  
#Sized to ensure non-erosive velocities leaving forebay;  
Line 63: Line 63:
|Permanent Pool Depth
|Permanent Pool Depth
|Vegetation requirements, rapid settling
|Vegetation requirements, rapid settling
|The average permanent pool depth should range from 150 mm to 300 mm
|style="text-align: left|The average permanent pool depth should range from 150 mm to 300 mm
|-
|-
|Active Storage Depth
|Active Storage Depth
|Storage/flow control, sustaining vegetation
|Storage/flow control, sustaining vegetation
|Maximum 1.0m for storms < 10 year event
|style="text-align: left|Maximum 1.0m for storms < 10 year event
|-
|-
|Side Slopes  
|Side Slopes  
|Safety  
|Safety  
|
|style="text-align: left|
#5:1 For 3 m above and below permanent pool;  
#5:1 For 3 m above and below permanent pool;  
#Maximum 3:1 elsewhere
#Maximum 3:1 elsewhere
Line 77: Line 77:
|Inlet  
|Inlet  
|Avoid clogging/freezing  
|Avoid clogging/freezing  
|
|style="text-align: left|
#Minimum 450 mm;  
#Minimum 450 mm;  
#Preferred pipe slope: >1%;  
#Preferred pipe slope: >1%;  
Line 84: Line 84:
|Outlet  
|Outlet  
|Avoid clogging/freezing  
|Avoid clogging/freezing  
|
|style="text-align: left|
#Minimum: 450mm outlet pipe;  
#Minimum: 450mm outlet pipe;  
#Preferred pipe slope: >1%;  
#Preferred pipe slope: >1%;  
Line 92: Line 92:
|Maintenance Access  
|Maintenance Access  
|Access for backhoes or dredging equipment
|Access for backhoes or dredging equipment
|
|style="text-align: left|
#Provided to approval of Municipality;  
#Provided to approval of Municipality;  
#Provision of maintenance drawdown pipe preferred
#Provision of maintenance drawdown pipe preferred
Line 98: Line 98:
|Buffer  
|Buffer  
|Safety  
|Safety  
|Minimum 7.5 m above maximum water quality/erosion control water level
|style="text-align: left|Minimum 7.5 m above maximum water quality/erosion control water level
|}
|}